Abstract
From a review of individual time standards, handbook data, the results of experiments and on-site industrial observations, a database of operation times for the assembly of electronic components is developed. The results are presented in a form useful in cost estimating procedures.
Similar content being viewed by others
References
G. Boothroyd and P. Dewhurst,Design for Assembly Handbook, 1983.
G. Boothroyd and P. Dewhurst,Design for Robot Assembly Handbook, 1985.
H. Connelly,Printed Circuit Board Design for Assembly — Component Delivery, M.S. Thesis, Department of Mechanical Engineering, University of Massachusetts, 1986.
J. John and G. Boothroyd,Economics of Printed Circuit Board Assembly, Report No. 6, Department of Mechanical Engineering, University of Massachusetts, 1986.
P. Ostwald,American Machinist Cost Estimator, 1985/86 Edition, McGraw Hill Inc.
B. S. Matisoff,Handbook of Electronics Manufacturing Engineering, 1978, VanNostrand Reinhold Co.
‘Technology Paces Electronics Assembly’,Assembly Engineering,29(5), May 1986, p. 38
R. S. Villanucci,Electronic Techniques, Prentice-Hall Inc.
Author information
Authors and Affiliations
Rights and permissions
About this article
Cite this article
Boothroyd, G., Shinohara, T. Component insertion times for electronics assembly. Int J Adv Manuf Technol 1, 3–18 (1986). https://doi.org/10.1007/BF02601550
Issue Date:
DOI: https://doi.org/10.1007/BF02601550