ISSN:
1573-0727
Keywords:
I DDQ test
;
test selection
;
bridging faults
Source:
Springer Online Journal Archives 1860-2000
Topics:
Electrical Engineering, Measurement and Control Technology
Notes:
Abstract I DDQ measurement is a time consuming process. Thus, reducing the number of I DDQ measurements have a great impact on the test time. Carefully selecting a few I DDQ measurement points is therefore an important problem. This problem has been studied for detecting leakage faults but not for bridging faults. We present novel algorithms to select I DDQ measurement points to detect bridging faults. Experimental results obtained are very encouraging. The method can also be used: by test generators to compress I DDQ test sets; and to maximize the fault coverage when a fixed number of measurement points are given.
Type of Medium:
Electronic Resource
URL:
http://dx.doi.org/10.1007/BF00133389
Permalink