Publication Date:
2019-07-13
Description:
The Integrated Science Instrument Module (ISIM) of the James Webb Space Telescope (JWST) is discussed from a systems perspective with emphasis on development status and advanced technology aspects. The ISIM is one of three elements that comprise the JWST space vehicle and is the science instrument payload of the JWST. The major subsystems of this flight element and their build status are described.
Keywords:
Instrumentation and Photography
Type:
GSFC.CP.4764.2011
,
SPIE Telescopes and Instrumentation; Jun 26, 2011 - Jul 02, 2011; San Diego, CA; United States
Format:
application/pdf
Permalink